Debate: Should we pre-fill tapered joints before knocking down? I tried skipping that step on a big house in Austin and it backfired.
I always pre-fill deep tapered joints before taping, but on a 12-room spec house I decided to save time and just mud over them. Figured the taper wasn't that bad, but the tape bubbled up in three spots and I had to cut and patch. Has anyone else found a way to skip pre-fill without issues, or is it always a risk?