Thought I was hot stuff tagging every conduit run in the field, until a guy on the punch walk pulled up my own labels wrong | Construction Tech - Opinions Matter
Thought I was hot stuff tagging every conduit run in the field, until a guy on the punch walk pulled up my own labels wrong
Spent 6 months last year marking every run with a Sharpie and arrow on the pull string, figured I was the only one on the crew who cared. Foreman pulled up my as-builts in Procore on his iPad at the walkthrough and half my tags were flipped on the vertical runs because I never noted which end I started from. Anyone else get burned by assuming your field marks would match the model without a reference point?