The finisher at the Iowa State Fair demo showed me the two-pass edge trick and my curb work hasn't been the same
I was at the Iowa State Fair back in August watching the concrete demo tent, mostly killing time while my kids looked at the butter cow. The guy running it was finishing a small curb section and he did a light pass first with the edger just to set the line, then came back with a second pass once it firmed up for the real shape. I'd always tried to get it all in one go and fought tear-outs the whole time. Tried it on a sidewalk job in Des Moines two weeks later and the edges came out way cleaner. Any of you run two passes on edges, or do you just wait for the right set and go once?