Broom finish on a driveway in Gary beat the stamped patio I fought with all morning
Did two jobs in Gary on the same day and the difference was night and day. The stamped patio took me about 4 hours fighting edges and touch ups, and the broom finish driveway was done in 90 minutes and looked clean. The stamped stuff kept drying on me before I could get the texture right, and the broom just flowed. I charged the same rate for both, which got me thinking about how I price work. Still not sure I want to keep pushing stamped jobs if the simple stuff pays the same. How do you all handle pricing when one job takes three times the effort?