Walked a job site in Nashville last week, the super's tape trick saved me a callback
I was touring a 12,000 sq ft retail build in Nashville and noticed the super keeps a roll of blue painter's tape on his belt at all times. He marks every outlet and switch box before drywall goes up so nobody has to cut in blind later, and he swears it killed his rework calls. Anyone else doing this on their builds?