TIL why my panel swaps got faster after a 15 minute talk with a supply house guy in Tulsa
Stopped by a supply house in Tulsa on a Tuesday morning and the counter guy asked why I always bought panels pre-stripped. I told him it saved me time on can swaps, but he pointed out I was paying $12 extra per panel and still cutting and landing the same wires. Started ordering plain cans and batching my prep on the bench at home, and a 4 panel week turned into a 2 day job. Anyone else do their wire prep off site or is that just asking for trouble on service calls?