I finally watched a control joint blow out on a 40 foot pour in Fresno
We poured a 40 foot slab on Thursday and by Friday morning the joint had cracked clean off the line about 3 inches over. My lead guy wanted to blame the mix but I cut it at 5:30 in the afternoon when it was still 94 degrees out and I should have waited. I told the homeowner we own it and we'll sawcut and patch it right, no charge. How late in the day do you all push your cuts when it's still hot in the valley?